1-2 Weeks Lead Time
The lead time for these OEM replacement parts is 1-2 Weeks from the date of the order.

Weight | 0.5 lbs |
---|---|
Dimensions | 3 × 3 × 3 in |
Categories
- Compound Switch (1)
- Continuous Level Transmitters (2)
- Differential Pressure Switch (1)
- In-Stock Level Switches (15)
- In-Stock Pressure Switches (7)
- In-Stock Vacuum Switches (5)
- In-Stock-Products (17)
- In-Stock-Temperature-Switch (4)
- Multi Level Switches (3)
- OEM Replacement Parts (30)
- Pressure Switches (141)
- uncategorized (126)
- Pressure Transducers (2)
- Temperature Switches (4)
- Ultrasonic Sensors (8)
- Vacuum Switches (8)
- Vibrating Forks/Rods (3)